Relevant Projects - Traffic Road Solutions

 

18,570,000 USD
18 Months
26,750 m2

27th of February Viaduct

  • First viaduct built in the Dominican Republic, it allows traffic in both directions with a total of four lanes.

  • Length: 1,900 ml.

  • Concrete: 32,910 m3

  • Box Girders: 313 units (13,830 Ton)

  • Precast Concrete: 8,520 m2 (20,450 Ton)

 

10,560,000 USD
4 Months
15,050

Tunnel of the Americas

  • Completed in just 4 months, this project consists of an open tunnel of 760 linear meters for four lanes (19.80 meters wide).

  • 7.70 meters high.

  • 498 ml of Ramps.

  • 25,200 m3 Concrete.

8,070,000 USD
18 Months
7,060 m2 Structures
38,400 m2 Roads

Elevated High Way in  30 de Mayo Avenue. - Independence Avenue & Luperon Avenue

  • 4-lane elevated highway of 490 linear meters.

  • Asphalt paving of the Av. Independencia circuit - Luperón Elevated - 30 de Mayo Elevated (11,750 m3)

  • Storm Drainage Works on Independencia Avenue

  • 18,780 m3 Concrete

  • 740 m3 (1,780 Ton) Box Girders for Elevated Luperon

5,215,000 USD
8 Months
20,208 m2 Total

Overpasses on Av. 27 de Febrero with Av. Tiradentes & Av. 27 de Febrero with Av. Máximo Gomez

1,347 m2 of Structures

9,265 m3 Concrete

9,700 m2 of prefabricated walls

 